Los Angeles housing-program research guide

CHIP vs SB 79 vs SB 684 / SB 1123:What should you check for a Los Angeles property?

Start with what you want to do. These branches point to official research paths; the property and proposed project still need review.

What are you trying to do?

A starting point can be relevant without being available to your project. These are research directions, not program recommendations.

Three starting points, different questions

Use this comparison to pick sources to open, not to estimate units or establish eligibility.
Program / first official sourceQuestion to investigateProject conceptDo not assume
SB 79 / LA Low-Rise
City SB 79 hub ↗
Current local transit rules for this parcel.Low-Rise housing near transit.A transit buffer alone establishes development rights.
Citywide Housing Incentive Program (CHIP)
City CHIP hub ↗
Incentives for the proposed affordability and site.Housing with restricted affordable units.All CHIP pathways share thresholds or procedures.
Starter Home Revitalization Act (SHRA)
City SHRA hub ↗
Streamlined subdivision for the proposed lots and housing.Small ownership homes or a condominium development.SB 684 and SB 1123 are separate program choices.

Research path / Transit and local implementation

SB 79 and Los Angeles Low-Rise

Planning reports that SB 79 took effect July 1, 2026; LA’s Low-Rise and Phased Implementation ordinances became effective June 30. The City’s phased approach includes temporary exemptions and permanent exclusions. It is not enough to draw a circle around a station.

Have ready
Parcel match, zoning and overlays, displayed transit/program category, existing housing, proposed work, and affordability concept.
Open first
The City SB 79 hub and its current ZIMAS mapping. The City-linked StoryMap remains labeled draft/exploratory.
Do not assume
A mapped area establishes approval, or an SB 79 result is a Low-Rise result. Each needs its own context.

Low-Rise belongs in the CHIP conversation. Ordinance 188967 (PDF) updates MIIP and renames the former Corridor Transition incentive area to Low-Rise. Older CT maps and training materials are still linked on the CHIP page; read them alongside the adopted update.

Investigating SB 79 / Low-Rise for a specific address? Follow the five-step property research sequence.

Research path / Housing incentives

CHIP: identify the pathway first

The question: Which incentive and affordability framework should the project team investigate? Planning identifies three programs under the Citywide Housing Incentive Program:

CHIP / STATE PATHWAY

State Density Bonus Program

LA’s primary mechanism for implementing State Density Bonus Law. Investigate how proposed affordable housing relates to available development incentives.

CHIP / MIIP

Mixed Income Incentive Program

Local incentives tied to eligible transit areas and corridors. Check the geographic pathway, affordability requirements, and current Low-Rise amendments.

CHIP / AHIP

Affordable Housing Incentive Program

Includes 80–100% affordable developments and specified faith-based, shared-equity, and public-land categories. Ownership and project type matter.

Have ready
Zoning, General Plan designation, lot area, applicable plans/conditions, proposed unit mix and affordability, ownership category, and requested incentives or waivers.
Open first
The City CHIP page’s Procedures and Resources section, then the program’s referral forms for the applicable Zoning Code chapter.
Do not assume
One density number or a “CHIP” label answers every pathway. Base density, proposed units, and the requested incentives serve different purposes.

Planning’s Maximum Allowable Residential Density (MARD) guide (PDF) distinguishes base density from total proposed units and explains how program thresholds differ. Its procedures chart (PDF) distinguishes review paths by requested incentives and waivers. Low-Rise also has specific limits on combining incentives in Ordinance 188967, Section 9.

Research path / Subdivision and ownership housing

SHRA, SB 684, and SB 1123

SHRA is the framework. SB 684’s amendments took effect July 1, 2024. SB 1123’s amendments took effect July 1, 2025 and expanded eligibility to qualifying vacant single-family-zoned sites. The City’s current implementation memo also incorporates AB 130 (2025); an old SB 684-only checklist is incomplete.

Have ready
Pre-subdivision lot area and zoning; existing structures and occupancy history; proposed lots, units, and ownership structure; prior subdivisions; Housing Element site status; environmental constraints and access.
Open first
The City SHRA page. Its ZIMAS directions are: enter the address → Planning and Zoning → SHRA / SB 684 Eligibility. Use the linked filing checklists and implementation memo for the project review.
Do not assume
A site screen confirms the project. “Vacant” is defined by the law; merely unoccupied is insufficient. SHRA is also distinct from the City’s Small Lot Subdivision Ordinance.

See the October 28, 2025 implementation memo (PDF), including FAQ 1 on vacancy and FAQ 10 on Small Lot Subdivision standards. The memo expressly covers Chapter 1; confirm the applicable guidance for a Chapter 1A site.

Keep draft proposals separate. Planning’s Missing Middle LA page identifies its September 2026 package as a second draft for public review. Proposed Starter Home and Small Lot changes should not be treated as adopted SHRA requirements.

Can more than one program matter?

Yes, but investigate the permitted relationship. Low-Rise is within MIIP. Separately, the City’s SHRA memo, FAQ 2, pages 12–13 (PDF), describes using affordable-housing incentives with an SHRA project, subject to both frameworks.

That is not unrestricted stacking: the memo preserves SHRA limits, distinguishes local standards from SHRA standards, and specifies simultaneous filing. Ask Planning to confirm a proposed combination, particularly where Low-Rise’s own incentive limits are involved.

Not sure yet? Build a one-page property brief.

  • Where: confirmed jurisdiction, address, parcel identifier, and lot boundary.
  • What is there: full zoning, overlays, existing structures, occupancy, and available records.
  • What you want: new housing, retention or demolition, subdivision, tenure, and affordability intent.
  • What is unresolved: conflicting map results, missing records, or assumptions to confirm.

Start the record work with the LA permit-history workflow. For an existing accessory unit, use the ADU checklist; for undocumented prior work, use the retroactive-permit guide.

Official source directory

Verify the pathway with the agency

Reviewed September 17, 2026. Follow each program page to current forms, maps, and contact instructions.

Permit Deep Research

Need the actual property record checked?

Give us the address. We follow the paper trail. PermitPulse can trace available public records, organize source links, flag contradictions or missing evidence, and identify questions still needing agency or professional confirmation.

Requests are reviewed before payment is arranged. PermitPulse does not make official eligibility, zoning, entitlement, legal, architectural, engineering, or approval determinations.